| | | |
2 BURBANK PLACE, BAULKHAM HILLS | Project Description Review of the building air conditioning consumption at 2 Burbank Place, Baulkham Hills. Project Details Client: Capital Corporation Location: Baulkham Hills, NSW Status: Completed 2019 | | 62 NORWEST BOULEVARD, NORWEST | Project Description Annual BEEC and NABERS review of the Mechanical services at 62 Norwest Boulevard, Norwest. Project Details Client: Capital Corporation Location: Norwest, NSW Status: Current (Annual) | | 8 SOLENT CIRCUIT, BAULKHAM HILLS | Project Description Full design of the Mechanical and Electrical services at 8 Solent Circuit, Baulkham Hills. This will involve an uplift and redevelopment to accommodate two 10-storey office buildings, above ground and basement parking, and a ground-level café and lobby. This project is currently underway and consists of four stages - brief/concept design, development application/design development, procurement and construction. Project Details Client: Touchstone Partners Location: Baulkham Hills Status: Current | | BIOTRONIK - 20 BRIDGE ST, PYMBLE | Project Description Peer review of the Mechanical services for Biotronik Australia. Project Details Client: Axiom Fitout Group Unit Trust / Yuhu Group Location: Pymble, NSW Status: Completed 2019 | |
| | | |
4 BURBANK PLACE, NORWEST - GECO GAMING FITOUT | Project Description Review of the Mechanical services for the GECO Gaming tenancy fitout located at L1, 4 Burbank Place, Norwest. Project Details Client: Nickaz Commercial Interiors Location: Norwest, NSW Status: Completed 2018 | | GORDON TOWN CENTRE | Project Description Due diligence review and report of the Mechanical services at Gordon Town Centre. Project Details Client: Ganellen Location: Gordon, NSW Status: Completed 2020 | | 287 MILITARY ROAD, CREMORNE | Project Description Investigation, review and report of the car park ventilation installed at 287 Military Road, Cremorne. Project Details Client: Bright & Duggan Location: Cremorne, NSW Status: Completed 2018 | | 21-23 LEXINGTON DRIVE, BELLA VISTA | Project Description Full design of the Mechanical services at 21-23 Lexington Drive, Bella Vista in addition to Section J, JV3 and NABERS modelling. This is a $91 million project covering 28,000 m2 of land, incorporating commercial office serviced apartments and retail tenancies. Project Details Client: Capital Bluestone Location: Bella Vista, NSW Status: Current | |
| | | |
12 SHELLEY STREET, SYDNEY - AMEX | Project Description Full design of the Mechanical, Electrical, Hydraulic and Fire services for the redevelopment of the AMEX fitout at 12 Shelley Street, Sydney. This is an 11-storey A-grade commercial office building. Project Details Client: American Express International Inc. Location: Sydney, NSW Status: Completed 2020 | | 2-4 PACIFIC HIGHWAY, ST LEONARDS | Project Description Review and report of the proposal for the conversion of the existing water-cooled air conditioning system to an air-cooled system at 2-4 Pacific Highway, St Leonards. Project Details Client: Knight Frank Australia Location: St Leonards, NSW Status: Completed 2020 | | THE CHAMBERS - 370 PITT STREET, SYDNEY | Project Description Design and construct for the Mechanical services relating to the chiller upgrade at 370 Pitt Street, Sydney. This involved three stages - a site inspection and report, tender documentation, selection options and construction services. Project Details Client: Strata Plan 46628 Location: Sydney, NSW Status: Completed 2018 | | LIVERPOOL MAZDA | Project Description Full design of the Mechanical services for the redevelopment of Liverpool Mazda, including schematic design, documentation and construction services. The project entailed the development of a new showroom, service centre and basement car park. Project Details Client: Automotive Holdings Group Location: Liverpool, NSW Status: Completed 2019 | |
| | | |
PYMBLE CORPORATE CENTRE | Project Description Project management and full design and documentation of the Mechanical services for Pymble Corporate Centre. This involved two three-storey towers and one four-store tower across 14,459 m2 and the accommodation of 1017 car park spaces. This included replacement of the air conditioning with 'like for like' water cooled package units, replacement of the existing diffusers with swirl diffusers and an option for the replacement of the controls with a BMCS. Project Details Client: Overland Corporation Location: Pymble, NSW Status: Completed 2018 | | 2 BURBANK PLACE, NORWEST - SUITE 6.02 VALVOLINE FITOUT | Project Description Review and resolution of the Mechanical services for the Valvoline Fitout, including schematic design, report, scope of works and construction administration. Project Details Client: Capital Corporation Location: Norwest, NSW Status: Current | | 66 CLARENCE STREET, SYDNEY | LEVEL 1 MAKE-GOOD & AMENITIES REFURBISHMENT Full design of the Mechanical services for the make-good and amenities refurbishment, including scope of reinstatement works, upgrade works, drawings, site inspections and quality audits. CHILLER UPGRADE Design and documentation for the chiller upgrade, including tender documentation and construction services. Project Details Client: Property & Asset Management / Tanert & JLL Location: Sydney, NSW Status: Completed 2019 | | 2 SOLENT CIRCUIT, BAULKHAM HILLS | Project Description Review and report relating to the proposed replacement of the air conditioning system at 2 Solent Circuit, Baulkham Hills. Project Details Client: Capital Corporation Location: Baulkham Hills, NSW Status: Completed 2018 | |
| | | |
61 YORK STREET, SYDNEY | Project Description NABERS assessment and report for 61 York Street, Sydney. Project Details Client: Sydney Property Location: Sydney, NSW Status: Completed 2017 | | ST JAMES CENTRE - 111 ELIZABETH STREET, SYDNEY | FIRE & SMOKE UPGRADE (2019-2020) Full design of the Mechanical services for the upgrade of the Fire and Smoke system. This includes detailed design and documentation, construction services and commissioning. BMCS UPGRADE (2017-2019) Review of the existing BMCS and production of a specification and drawings for the BMCS upgrade, including tender documentation and construction services. Project Details Client: Tanert via Sassifire / Tanert & JLL Location: Sydney, NSW Status: Completed | | 122 ARTHUR STREET, NORTH SYDNEY | Project Description Full design, documentation and report for the air conditioning upgrade at 122 Arthur Street, North Sydney. This project was finalised in 2020 and included the delivery of a report on the Mechanical services on the premises. Project Details Client: Dunns' Strata Location: North Sydney, NSW Status: Completed 2020 | | 44 BILOELA AVENUE, VILLAWOOD | Project Description Report on the air conditioning and exhaust services at 44 Biloela Avenue, Villawood. Project Details Client: Savills Australia Location: Villawood, NSW Status: Completed 2016 | |
| | | |
BLIGH CHAMBERS - 25 BLIGH STREET, SYDNEY | Project Description Review of the stair pressurisation plant in relation to obtaining and maintaining annual compliance at 25 Bligh Street, Sydney. Project Details Client: Kingsmede Location: Sydney, NSW Status: Completed 2018 | | BAIADA POULTRY HEAD OFFICE | Project Description Design and construct - including heat load calculations - for the Mechanical services at the Baiada Poultry Head Office. Project Details Client: Flux Air Location: Pendle Hill, NSW Status: Completed 2017 | | IMPERIAL TOBACCO | Project Description Full design of the Mechanical services for the refurbishment of the Imperial Tobacco fitout at 4-8 Inglewood Place, Baulkham Hills. This included schematic design, tender documentation and construction services. Project Details Client: Axiom Projects Location: Baulkham Hills, NSW Status: Completed 2017 | | AUSTRALIAN UNITY - CAMPBELLTOWN | Project Description Review of the Mechanical services at Australian Unity (Campbelltown) to advise on the existing diffusers layout in relation to the proposed fitout. Project Details Client: GreaterGroup Location: Campbelltown, NSW Status: Completed 2016 | |
| | | |